 Projects  Status
 Pumping Station and Pipeline
 Complete
 System Hydraulic Study
 In Progress
Leak Detection Analysis
 Ongoing
 Hydrant Repair Study & Plan            
 Complete
 Well 17 Rehabilitation 
 In Progress
 Well 17 Carbon Filtration System
 In Progress
 Stand Pipe Repair
 Planning
 Water Sphere Repair
 In Progress
 Interconnection Upgrades
 Complete
 System Maintenance to Valves, Hydrants, etc.
 Ongoing